Project Location: Desert Hot Springs, CA
Client: Palm Springs School District
Completion Date: 2002- Phase 1
Estimated Construction Cost: $9,000,000



The challenge of Julius Corsini was incorporating modular buildings into the current campus
site which consisted of rescued pieces from the district’s previous continuation school, while
providing the campus with its own feeling of ‘ belonging’.

The design concept behind the new campus proposes the use of simple and pure volumes, such as cubes or boxes to complement the pre-fabricated, modular classrooms placement, alongside the delicately detailed custom pieces such as the elevator and stair towers.

These vertical elements also closely balance the horizontal line of the buildings as well as the natural horizon of the surrounding landscape. In addition the vertical stair and elevator towers create focal points across the campus for each new phase of construction thus relating various campus buildings to each other.