Project Location: Cypress, California
Client: North Orange County Community College District
Completion Date: August 2006
Square Footage: 84,000 total
Construction Cost: $19,000,000
| 
Courtesy of TBP Architects
|
Flewelling & Moody serves as the Architect-of-Record on this project. A sole and separate Design Architect has been assigned for the initial design phases for these projects. As the Architect of Record, Flewelling & Moody provides design oversight and project coordination from Programming through the Design Development phases. Flewelling & Moody then provides Construction Documentation and Construction Administration and project close-out services.
This project consists of three separate buildings:
- Student Center Building with Bookstore. Construction of a new 2-story, 42,000SF, steel and glass structure with pedestrian bridges connecting the Student Center with the adjacent Administration Building and elevated Piazza Plaza.
- Student Activities Center. Conversion of the 7,000SF women’s shower locker room into a new campus activities center.
- Administration Building. Remodel of the 35,000SF 4-story Administration Building.

First Floor, Student Center with Bookstore
|

|
|